1255 CORPORATE DRIVE, SUITE 100

(972) 887-5555

IRVING, TEXAS 75038

©2019 Moye I.T. Consulting, LLC - All Rights Reserved.

Brownsville/South Padre International Airport New Passenger Terminal—Brownsville, TX

Brownsville/South Padre Island International Airport is developing a new international passenger terminal. The 90,000-SF terminal will accommodate both commercial and general aviation international
arrivals. Two of the terminal’s four gates will be will be equipped for international departures and arrivals.

 

The new terminal will be located directly in front of the existing terminal which will be demolished. Phasing will be required to maintain existing operations during construction of the new facility. Temporary corridors (passenger and sterile) between the old and new terminal buildings will be used until the new terminal in complete.


Moye Consulting is providing design services for the technology systems including a new Federal Inspection Services (FIS) facility and expanded security checkpoint. The security check point will receive automated screening lanes which include larger property bins, belts that return bins to the queue after bag screening is complete, and belts that divert bins containing potential threats so that cleared bins are allowed to continue through the system.

Systems
  • Voice and Data Network

  • Wi-Fi

  • Cellular Distributed Antenna System
    (DAS)

  • UHF/VHF Radio

  • Trunked Radio Systems

  • Airport Operations Database (AODB)

  • Video Surveillance

  • Access Control System (ACS)

  • Intrusion Detection

  • Master Antenna Television (MATV)

  • Common Use Passenger Processing
    Systems (CUPPS)

  • Electronic Visual Display (EVIDS)

  • Pathway and Data Connectivity to
    Baggage Handling System (BHS)

 

 

 

 

Services
  • Survey and Documentation

  • Programming

  • Estimate of Construction costs

  • Demolition Documents

  • Construction Phase Services

Owner: City of Brownsville, Texas

Client: CH2M Hill (Jacobs)

Estimated Construction Cost: $30 million

Estimated Completion Date: Q1 2020