1255 CORPORATE DRIVE, SUITE 100

(972) 887-5555

IRVING, TEXAS 75038

©2019 Moye I.T. Consulting, LLC - All Rights Reserved.

Austin-Bergstrom International Airport Terminal Expansion and Renovation —Austin, TX

This $350 million project includes an expanded concourse to accommodate additional aircraft parking spaces for both domestic and international operations. The 192,525-SF of addition and upgrades includes 10 new gates, ticketing lobby renovations, baggage infrastructure, security improvements, ancillary passenger facilities, and concourse circulation. To maintain existing operations during construction, a new temporary passenger walkway will be constructed. System improvements include the addition of new IT communications rooms to support IT and security services for the expanded terminal. Implementation of new common/shared use network equipment will be provided flexibility for airline gate assignments. IT systems included are new MuFIDS, new cellular DAS, public Wi-Fi system, paging system, airport television system, and security network infrastructure.

Systems
  • Premise Distribution System (PDS)

  • Voice and Data Network

  • 802.11 Wi-Fi

  • MuFIDS

  • MATV

  • CUPPS/CUSS

  • Cellular DAS

  • Audio/Visual

Services
  • Survey and Documentation

  • IT Design Manual

  • Demolition Documents

  • System Design

  • Construction Documents

  • Bid Analysis

  • Construction Phase Services

Owner: City of Austin - Aviation

Client: Gensler

Estimated Construction Cost: $350 million

Estimated Completion Date: Q1 2019