Austin-Bergstrom International Airport Parking Garage—Austin, TX

The proposed garage for Austin-Bergstrom International airport will be six levels with approximately 2,107,767 SF and 6,000 parking spaces. A dynamic LED screen indicating the number of available spaces will be provided at the entry to each level. Each parking space will have a light above the space that will illuminate red to indicate occupied or green to indicate vacant. Pedestrian walkways will be provided for access from the garage to the terminal building. This project is being completed in conjunction with a new airport administration building.

Systems
  • Premise Distribution System (PDS) and connectivity to other airport campus locations

  • Voice and Data Network

  • Access Control System (ACS)

  • Video Surveillance

  • Emergency Phone System

  • Wi-Fi System

  • Cellular Distributed Antenna System (DAS)/Public Safety DAS

  • Pathway and Data Connectivity to Support Parking Revenue Control System

  • Raceways for Parking Guidance Systems

Services
 
  • Stakeholder Interviews

  • Program Report

  • System Design

Owner: City of Austin, Department of Aviation

Client: PGAL

Estimated Construction Cost: $151 million

Estimated Completion Date: Q2 2019